GSM GPRS GPS Vehicle Tracker with Real-Time Location and Anti-Theft Alerts to Pinterest (opens in a new window)
(0.0) 0 Reviews Write a Review

GSM GPRS GPS Vehicle Tracker with Real-Time Location and Anti-Theft Alerts

GSM GPRS GPS vehicle tracker with Real-Time location and Anti-Theft alerts, for vehicle location monitoring through compatible GSM/GPRS service.

In stock

Free Shipping
$22.56

In stock

Free Shipping On all orders
30-Day Returns Easy returns
Secure Payment Encrypted checkout
Money Back Guarantee Refunds Within 14-Days
SKU: GV01027770TX Category: Tag:
Description

GSM GPRS GPS Vehicle Tracker with Real-Time Location and Anti-Theft Alerts

GSM GPRS GPS Vehicle Tracker with Real-Time Location and Anti-Theft Alerts

Key Features

  • Vehicle GPS tracker designed for owner-operated car or motorcycle anti-theft monitoring.
  • Supports GSM/GPRS network communication with GPS, BeiDou and LBS positioning functions.
  • Vehicle vibration and geofence alert functions can notify the configured owner account when supported by the connected service.
  • Relay-style installation supports compatible vehicle electrical systems.

Specifications

  • Color: Black
  • Material: ABS
  • Network: GSM / GPRS
  • Network bands: 850 / 900 / 1800 / 1900MHz
  • GPS module: MTK2503
  • Backup battery: 3.7V 100mAh
  • Dimensions: 31 x 31 x 57 mm

GSM GPRS GPS Vehicle Tracker with Real-Time Location and Anti-Theft Alerts

GSM GPRS GPS Vehicle Tracker with Real-Time Location and Anti-Theft Alerts

GSM GPRS GPS Vehicle Tracker with Real-Time Location and Anti-Theft Alerts

GSM GPRS GPS Vehicle Tracker with Real-Time Location and Anti-Theft Alerts

GSM GPRS GPS Vehicle Tracker with Real-Time Location and Anti-Theft Alerts

Return & Refund

Return or exchange requests for eligible products must be submitted within 30 calendar days of confirmed delivery. Non-defective items must be new, unused, suitable for resale, and returned with all original accessories and components. Products should also be returned in their original packaging.

All returns require prior authorization. Customers are generally responsible for return shipping costs for change-of-mind, no-longer-needed, or incorrectly ordered items. Where Global Versa provides a return label, the disclosed label cost may be paid by the customer or deducted from the refund.

For verified damaged, defective, incorrect, or incomplete orders, Global Versa may provide a replacement, replacement part, prepaid return label, shipping reimbursement, partial or full refund, or another appropriate resolution.

No restocking fee applies. Approved refunds are issued to the original payment method and should be received within 14 calendar days after the return has been received and inspected, or the claim has otherwise been approved.

Please review our full Return & Refund Policy before submitting a request.

Shipping & Delivery

We currently offer free standard shipping on all orders shipped within the 48 contiguous United States.

We do not ship to Alaska, Hawaii, U.S. territories, P.O. Boxes, APO/FPO addresses, or international destinations. Orders placed with unsupported shipping addresses may be cancelled and refunded.

Most orders are processed within 0–2 business days after successful payment authorization. Orders are processed and fulfilled Monday through Friday, excluding weekends and public holidays. Orders placed before 5:00 PM Eastern Time (ET), Monday through Friday, may begin processing the same business day. Standard delivery typically takes 2–5 business days after an order has been processed and shipped. Based on our standard handling and transit times, most orders arrive within 2–7 business days from the date the order is placed.

Orders may be shipped via USPS, UPS, FedEx, UniUni, GOFO, or another available shipping partner depending on product availability, delivery location, and carrier coverage.

Once your order has shipped, you will receive a shipping confirmation email with tracking information when available. If your order contains multiple items, they may arrive in separate packages.

Delivery times are estimates only and may vary due to carrier delays, weather conditions, public holidays, address issues, high order volume, or other events outside our control.

Please ensure your shipping address is complete and accurate at checkout. For shipping questions, contact us at [email protected].

0 reviews
0
0
0
0
0

There are no reviews yet.

Be the first to review “GSM GPRS GPS Vehicle Tracker with Real-Time Location and Anti-Theft Alerts”

Your email address will not be published. Required fields are marked *

You have to be logged in to be able to add photos to your review.